Semmering Base Tunnel

Semmering Base Tunnel in Gloggnitz – Mürzzuschlag, Austria: 27.3 km, under construction. Developer: ÖBB-Infrastruktur. Architect: —. Construction progress, photos and news.

Length
27.3 km
Type
Infrastructure
Status
Under construction
Stage
Topped out
Developer
ÖBB-Infrastruktur
Architect
—
Location
Gloggnitz – Mürzzuschlag, Austria

A twin-tube rail tunnel under the Semmering Pass between Lower Austria and Styria, replacing the steep 19th-century Semmering Railway on the main line from Vienna to Graz. Trains will run at up to 230 km/h.

Construction began in 2012 and tunneling finished at the end of 2024. In May 2026 an official delegation drove through the whole tunnel for the first time, and ÖBB now plans the first trains for the end of 2029, cutting Vienna–Graz to about 1 hour 50 minutes. The cost was last estimated at about €4.2 billion.