Lagos–Calabar Coastal Highway

Lagos–Calabar Coastal Highway in Lagos – Calabar, Nigeria: highway, 750 km, under construction. Developer: Federal Ministry of Works (contractor Hitech Construction). Architect: —. Construction progress, photos and news.

Design
750 km
Type
Highway
Status
Under construction
Stage
Rising
Developer
Federal Ministry of Works (contractor Hitech Construction)
Architect
—
Location
Lagos – Calabar, Nigeria

A concrete coastal highway planned to run about 750 km from Victoria Island in Lagos to Calabar, through nine coastal states including Ogun, Ondo, Delta, Bayelsa and Rivers.

Work started on the Lagos end in March 2024. The first 47 km section opened to traffic in December 2025. In October 2026 the works minister said five of the nine sections were under way and the whole road would be done in just over three years. Its cost, the contract award and demolitions along the route have drawn heavy criticism.