Kenitra–Marrakech High-Speed Line
Kenitra–Marrakech High-Speed Line in Kenitra – Marrakech, Morocco: high-speed rail, 430 km, under construction. Developer: ONCF (Moroccan National Railways). Architect: —. Construction progress, photos and news.

- Design
- 430 km
- Type
- High-speed rail
- Status
- Under construction
- Stage
- Rising
- Developer
- ONCF (Moroccan National Railways)
- Architect
- —
- Location
- Kenitra – Marrakech, Morocco
An extension of Al Boraq, Africa's first high-speed railway, south from Kenitra through Rabat and Casablanca to Marrakech. The 430 km line, designed for trains at up to 320 km/h, will also serve Casablanca's Mohammed V airport and the new stadium at Benslimane.
King Mohammed VI launched the works in April 2025. By April 2026 land purchase was complete and 15 viaducts were under way, and in May the transport minister put progress at about 30%. ONCF aims to start passenger service at the end of 2029, ahead of the 2030 World Cup, cutting Tangier–Marrakech to about 2 hours 40 minutes. The line itself is budgeted at about MAD 53 billion ($5.3 billion), within a MAD 96 billion rail program.
Similar projects
- Fehmarnbelt Tunnel · Rødby – Puttgarden · 18 km · Under construction
- Brenner Base Tunnel · Innsbruck – Fortezza · 55 km · Under construction
- HS2 (High Speed 2) · London – Birmingham · 225 km · Under construction
- Grand Paris Express · Paris · 200 km, 68 stations · Under construction
- Lyon–Turin Base Tunnel (Mont Cenis) · Saint-Jean-de-Maurienne – Susa · 57.5 km · Under construction
- Rail Baltica · Tallinn – Riga – Kaunas · 870 km · Under construction
Listed in: Infrastructure & megaprojects