ROQ City B
Under construction in Toronto
ROQ City B is a tower under construction in Toronto, with 33 floors planned. It is set to rise 114.3 m (375 ft) and is due for completion in 2026. That makes it the 35th tallest of the 48 towers being built in Toronto on our list.
- Height
- 114.3 m · 375 ft
- Floors
- 33
- Status
- Under construction
- Due
- 2026
- City
- Toronto, Canada
Next to it in the ranking
- 33rd · Bloor & Dufferin Building B1119.9 m
- 34th · Metro Park Condos South Tower114.6 m
- 36th · Bloor & Dufferin Building C2113.1 m
- 37th · M2M Condos Tower D112.8 m
See everything under construction in Toronto
Talk about Toronto
Open the Toronto city forum for news, photos and questions. Spot a mistake on this page? Tell us there.
Figures from our Toronto city list, mostly from the Council on Tall Buildings and Urban Habitat's Skyscraper Center. Heights and dates for buildings under construction can change.