Bloor & Dufferin Building B1
Under construction in Toronto
Bloor & Dufferin Building B1 is a tower under construction in Toronto, with 34 floors planned. It is set to rise 119.9 m (393 ft) and is due for completion in 2026. That makes it the 33rd tallest of the 48 towers being built in Toronto on our list.
- Height
- 119.9 m · 393 ft
- Floors
- 34
- Status
- Under construction
- Due
- 2026
- City
- Toronto, Canada
Next to it in the ranking
- 31st · Dufferin Grove Village Tower B125 m
- 32nd · Forêt Tower 3124.9 m
- 34th · Metro Park Condos South Tower114.6 m
- 35th · ROQ City B114.3 m
See everything under construction in Toronto
Talk about Toronto
Open the Toronto city forum for news, photos and questions. Spot a mistake on this page? Tell us there.
Figures from our Toronto city list, mostly from the Council on Tall Buildings and Urban Habitat's Skyscraper Center. Heights and dates for buildings under construction can change.