Bloor & Dufferin Building C2
Under construction in Toronto
Bloor & Dufferin Building C2 is a tower under construction in Toronto, with 32 floors planned. It is set to rise 113.1 m (371 ft) and is due for completion in 2026. That makes it the 36th tallest of the 48 towers being built in Toronto on our list.
- Height
- 113.1 m · 371 ft
- Floors
- 32
- Status
- Under construction
- Due
- 2026
- City
- Toronto, Canada
Next to it in the ranking
- 34th · Metro Park Condos South Tower114.6 m
- 35th · ROQ City B114.3 m
- 37th · M2M Condos Tower D112.8 m
- 38th · ME Living Condos Tower 5109.8 m
See everything under construction in Toronto
Talk about Toronto
Open the Toronto city forum for news, photos and questions. Spot a mistake on this page? Tell us there.
Figures from our Toronto city list, mostly from the Council on Tall Buildings and Urban Habitat's Skyscraper Center. Heights and dates for buildings under construction can change.