Queen Church
Under construction in Toronto
Queen Church is a tower under construction in Toronto, with 57 floors planned. It is set to rise 186.2 m (611 ft) and is due for completion in 2028. That makes it the 8th tallest of the 48 towers being built in Toronto on our list.
- Height
- 186.2 m · 611 ft
- Floors
- 57
- Status
- Under construction
- Due
- 2028
- City
- Toronto, Canada
Next to it in the ranking
- 6th · The Pemberton215.8 m
- 7th · Q Tower197.6 m
- 9th · The United BLDG184.8 m
- 10th · 241 Church Street170.1 m
See everything under construction in Toronto
Talk about Toronto
Open the Toronto city forum for news, photos and questions. Spot a mistake on this page? Tell us there.
Figures from our Toronto city list, mostly from the Council on Tall Buildings and Urban Habitat's Skyscraper Center. Heights and dates for buildings under construction can change.