Parkside Square Tower A
Under construction in Toronto
Parkside Square Tower A is a tower under construction in Toronto, with 34 floors planned. It is set to rise 109.3 m (359 ft) and is due for completion in 2026. That makes it the 39th tallest of the 48 towers being built in Toronto on our list.
- Height
- 109.3 m · 359 ft
- Floors
- 34
- Status
- Under construction
- Due
- 2026
- City
- Toronto, Canada
Next to it in the ranking
- 37th · M2M Condos Tower D112.8 m
- 38th · ME Living Condos Tower 5109.8 m
- 40th · Rushden Station Tower A108.2 m
- 41st · Cielo Condos103.8 m
See everything under construction in Toronto
Talk about Toronto
Open the Toronto city forum for news, photos and questions. Spot a mistake on this page? Tell us there.
Figures from our Toronto city list, mostly from the Council on Tall Buildings and Urban Habitat's Skyscraper Center. Heights and dates for buildings under construction can change.