Bloor & Dufferin Building B2
Under construction in Toronto
Bloor & Dufferin Building B2 is a tower under construction in Toronto, with 37 floors planned. It is set to rise 128.9 m (423 ft) and is due for completion in 2026. That makes it the 27th tallest of the 48 towers being built in Toronto on our list.
- Height
- 128.9 m · 423 ft
- Floors
- 37
- Status
- Under construction
- Due
- 2026
- City
- Toronto, Canada
Next to it in the ranking
- 25th · M2M Condos Tower C129.9 m
- 26th · Yonge at Wellesley Station129.4 m
- 28th · 9 Saint Dennis Drive128 m
- 29th · Pinnacle Lakeside Tower 2126.8 m
See everything under construction in Toronto
Talk about Toronto
Open the Toronto city forum for news, photos and questions. Spot a mistake on this page? Tell us there.
Figures from our Toronto city list, mostly from the Council on Tall Buildings and Urban Habitat's Skyscraper Center. Heights and dates for buildings under construction can change.